1) Metro Green Line, (9 Transit Station on Metro Green Line start from Hawthorne To Norwalk station.
Dates: 1994 to 1995
Description: this project covers the design and construction of nine transit stations on Metro Green Line started from Hawthorne, Crenshaw, Vermont, Harbor, Avalon, Wilmington, Long Beach, Lakewood, to Norwalk station. This project included several Phases: Phase I (structural work), Phase II (architectural work), Phase III (elevator and escalator work), Phase IV (art work).
Dates: 1994 to 1995
Description: this project covers the design and construction of nine transit stations on Metro Green Line started from Hawthorne, Crenshaw, Vermont, Harbor, Avalon, Wilmington, Long Beach, Lakewood, to Norwalk station. This project included several Phases: Phase I (structural work), Phase II (architectural work), Phase III (elevator and escalator work), Phase IV (art work).
2) Regional Connector Transit Corridor Project
The project includes three underground stations, anticipated to be constructed using conventional cut-and-cover construction methods. The limits of these stations are listed above in Section 2.1. They are summarized below, from east to west.
The project includes three underground stations, anticipated to be constructed using conventional cut-and-cover construction methods. The limits of these stations are listed above in Section 2.1. They are summarized below, from east to west.